Ive been busy with a list of dos.
1. Complete new paint.
2. 160/60 on the frt and 195/55/16 on back.
3. new brake pads frt and rear.
oil / filter.
4. bag fillers.
5. brake and shift lever bushings.
6. Lowered 1.5
7. new plugs and 10mm wires.
8. new mirrors.
9. kicker spkers in frt.
10. lined trunk.
11. serviced battery and connects
12. added tire psi monitor.
13. blacked out misc items.
1. Complete new paint.
2. 160/60 on the frt and 195/55/16 on back.
3. new brake pads frt and rear.
oil / filter.
4. bag fillers.
5. brake and shift lever bushings.
6. Lowered 1.5
7. new plugs and 10mm wires.
8. new mirrors.
9. kicker spkers in frt.
10. lined trunk.
11. serviced battery and connects
12. added tire psi monitor.
13. blacked out misc items.